Transportation I-69 PATOKA RIVER BRIDGE

INSIDE THE PROJECT

This $35 million Design-Build bridge project was the last project to be completed before the opening of 67-miles of I-69. The project involved the construction of twin 4,400-foot-long bridges over the Patoka River while overcoming months of sustained flooding, working in variable rock depths in a seismic zone, and adhering to strict environmental standards. Access challenges included maintaining stable work roads in a floodplain during one of the wettest years on record.

Kokosing self-performed all substructure and superstructure work, including 59 piers founded on 118 drilled shafts, some over 100-feet-long, 18,250-cubic-yards of structural concrete, 7.5-million-pounds of rebar, and 244 90-inch-tall concrete I-beams.

PROJECT DETAILS:
  • Project Owner:
    Indiana Department of Transporation
  • Location:
    Pike & Gibson Counties, Indiana
  • Project Value:
    $35,100,000
  • Delivery Method:
    Design-Build
CAPABILITIES:
  • Beam/Girder Erection
  • Bridges
  • D-B/CMGC
PROJECT AWARDS INCLUDE:
  • Merit Award – ACEC 2015