Industrial Maintenance COKE TRANSFER CONVEYOR SYSTEM

This project consisted of installing three multi-level transfer towers, 500 feet of tube gallery conveyor, over 1000 feet of Box Truss conveyors and a rail load-out tower with associated equipment.

The tube gallery conveyors were shipped in 10’ diameter x 40’ long pieces. These pieces were pre-assembled and set in sections as long as 160’ long. The sections were set in close coordination with operating mainline railroad tracks. The project was completed on time to allow the metallurgical coke to be delivered to an operating blast furnace from a newly completed coke plant.

PROJECT DETAILS:
  • Project Owner:
    Confidential Client
  • Location:
    Southwest Ohio
  • Project Value:
    $3,309,630
  • Delivery Method:
    Self Performed
SERVICES:
  • Rigging & Equipment Setting
  • Structural Steel