Industrial Maintenance OIL & GAS METERING SKIDS

McGraw Kokosing fabricated and assembled Three 12” metering skids for an oil terminal in the South-Central U.S along a 56 mile oil pipeline.

The project involved the pipe and skid fabrication, pipe assembly and electrical installation of three pipeline metering skids with flow rates of 100,000 bbl/day. The fabrication requirements also included Non-Destructive Testing (100% X-ray) of all pipe welds and shop hydrostatic testing of all pipe spools. Fabrication and assembly was performed at the Monroe Pipe Fabrication facility and shipped to the customer for installation.

PROJECT DETAILS:
  • Project Owner:
    Confidential Client
  • Location:
    South Central Ohio
  • Delivery Method:
    Self-Performed
SERVICES:
  • Rigging & Equipment Setting