Industrial Maintenance BOF MACT EMISSIONS SYSTEM DUCTWORK INSTALLATION > Projects > BOF Mact Emissions System Ductwork Installation This project involved the installation of eighty-three pieces of large diameter ductwork, erection of new modular computer room, and a modular control building for a new emission system while the basic oxygen furnace shop was in full operation. The ductwork included the following: three vertical uptake duct routes consisting of thirty-three pieces twenty-two pieces of charge aisle duct twenty-eight pieces of tap side duct The computer room was constructed of 5 pre-fabricated modules. The new control building was installed over the Hot Metal Car Track using two prefabricated modules on an elevated structural platform. Installation of both buildings included all foundation and support steel as well as the power and fiber optic cables. The Client met EPA requirements with the upgraded emissions system. The Plant maintained full operations while McGraw Kokosing completed the project in under seven months. PROJECT DETAILS: Project Owner: Confidential Client Location: Southwest Ohio Project Value: $3,000,000 Delivery Method: Self-Performed SERVICES: Structural Steel Electrical & Instrumentation Rigging & Equipment Setting Concrete
This project involved the installation of eighty-three pieces of large diameter ductwork, erection of new modular computer room, and a modular control building for a new emission system while the basic oxygen furnace shop was in full operation. The ductwork included the following: three vertical uptake duct routes consisting of thirty-three pieces twenty-two pieces of charge aisle duct twenty-eight pieces of tap side duct The computer room was constructed of 5 pre-fabricated modules. The new control building was installed over the Hot Metal Car Track using two prefabricated modules on an elevated structural platform. Installation of both buildings included all foundation and support steel as well as the power and fiber optic cables. The Client met EPA requirements with the upgraded emissions system. The Plant maintained full operations while McGraw Kokosing completed the project in under seven months. PROJECT DETAILS: Project Owner: Confidential Client Location: Southwest Ohio Project Value: $3,000,000 Delivery Method: Self-Performed SERVICES: Structural Steel Electrical & Instrumentation Rigging & Equipment Setting Concrete