Industrial Maintenance BLAST FURNACE STRUCTURAL STEEL AND DUCT INSTALLATION

Over the 10-month schedule McGraw Kokosing furnished and installed 450′ long by 11′ main duct run at an elevation of 70′ between the cast house and baghouse facilities; 180 tons of structural steel supports, platforms, and walkways; 650 linear feet of 8 to 11-foot diameter duct, transitions and hoods in the Cast Houses and under the Skip Hoist; and numerous electrical, structural, and pipe relocations.

All of the work was closely coordinated with plant operations and maintenance crews during operating turns, downturns and through a major outage to ensure the project was completed with minimal production interruptions.

PROJECT DETAILS:
  • Project Owner:
    Private Steel Client
  • Location:
    Southwest Ohio
SERVICES:
  • Process Piping
  • Structural Steel