Transportation CLEVELAND HOPKINS AIRPORT RUNWAY EXTENSION

INSIDE THE PROJECT

This $40.7 million airport improvements project had Kokosing extend Runway 6R-24L by more than 2,000 feet and construct and lengthen crossing and parallel taxiways.

With the use of three company-owned concrete pavers and Bidwell machines, Kokosing installed an 8-inch cement-treated base course and topped it with 106,000 square yards of 15-inch and 16-inch P501 portland cement concrete pavement. Concrete for the project was produced by one of Kokosing’s Erie Strayer portable plants and by a local readymix supplier.

Project requirements also had Kokosing perform concrete-pavement removal, mass grading and installation of large-diameter drainage.

PROJECT DETAILS:
  • Project Owner:
    Cleveland Hopkins Airport
  • Location:
    Cleveland, Ohio
  • Project Value:
    $40,700,000
  • Delivery Method:
    Design-Bid-Build
CAPABILITIES:
  • Concrete Paving