Industrial Maintenance COMBINED CYCLE ENERGY GENERATION STATION

McGraw Kokosing erected and installed four Heat Recovery Steam Generators at a 1,100 MW combined cycle power plant.

The work self-performed included the foundations for the pipe racks and auxiliary equipment, installation of structural steel and platforms, casing and ductwork, erection of four stacks and all piping systems, and installation of the remaining mechanical systems. The erection of the HRSG’s included numerous lifts in access of 100 tons. The combined overall weld radiographic acceptance rate was 99.41%.

PROJECT DETAILS:
  • Project Owner:
    Confidential Client
  • Location:
    Southeast Indiana
  • Delivery Method:
    Greenfield Project
SERVICES:
  • Structural Steel
  • Rigging & Equipment Setting
  • Process Piping
  • Concrete