Industrial Maintenance GAN VESSEL INSTALLATION > Projects > Gan Vessel Installation McGraw Kokosing was contracted to install a new GAN vessel in an operating steel plant. The project began with pipe fabrication at our off-site facility in Monroe. Preparation on site included site excavation, installation of 16 auger cast piles and pouring the 23β x 30β pile cap. The GAN Vessel was unloaded at the rail yard and transported over 1-mile to the job site by a self-propelled hydraulic platform trailer. Once the vessel was set, we completed the installation of the process piping and instrumentation. PROJECT DETAILS: Project Owner: Confidential Client Location: Northern Kentucky SERVICES: Rigging & Equipment Setting Pipe Fabrication Concrete Process Piping
McGraw Kokosing was contracted to install a new GAN vessel in an operating steel plant. The project began with pipe fabrication at our off-site facility in Monroe. Preparation on site included site excavation, installation of 16 auger cast piles and pouring the 23β x 30β pile cap. The GAN Vessel was unloaded at the rail yard and transported over 1-mile to the job site by a self-propelled hydraulic platform trailer. Once the vessel was set, we completed the installation of the process piping and instrumentation. PROJECT DETAILS: Project Owner: Confidential Client Location: Northern Kentucky SERVICES: Rigging & Equipment Setting Pipe Fabrication Concrete Process Piping