Industrial Maintenance OIL & GAS PIPELINE PUMP STATION > Projects > Oil & Gas Pipeline Pump Station McGraw Kokosing performed the pipe fabrication, equipment setting, installed the process piping and instrumentation for an oil and gas pump station. The pipe fabrication consisted of approximately 850 feet of pipe including over 3200 diameter inches of carbon steel welding with 100% X-ray and Magnetic Particle testing of all welds. Shop hydrostatic testing was performed on all tie-ins spools in order to accelerate the installation schedule. Pipe spool delivery was closely coordinated with our field installation crews due to the small project site. Field equipment setting included two new 1500HP pumps along with the pre-fabricated pipe. PROJECT DETAILS: Project Owner: Confidential Client Location: Northern Ohio Delivery Method: Self-Performed SERVICES: Pipe Fabrication Rigging & Equipment Setting
McGraw Kokosing performed the pipe fabrication, equipment setting, installed the process piping and instrumentation for an oil and gas pump station. The pipe fabrication consisted of approximately 850 feet of pipe including over 3200 diameter inches of carbon steel welding with 100% X-ray and Magnetic Particle testing of all welds. Shop hydrostatic testing was performed on all tie-ins spools in order to accelerate the installation schedule. Pipe spool delivery was closely coordinated with our field installation crews due to the small project site. Field equipment setting included two new 1500HP pumps along with the pre-fabricated pipe. PROJECT DETAILS: Project Owner: Confidential Client Location: Northern Ohio Delivery Method: Self-Performed SERVICES: Pipe Fabrication Rigging & Equipment Setting