Industrial Maintenance OIL & GAS PIPELINE VALVE STATIONS

McGraw Kokosing fabricated and assembled 62 Twenty-inch valve stations with Twelve-inch stainless steel bypass lines for a 350 mile NGL Pipeline.

The fabrication consisted of over 24,000 diameter inches of welding, with 100% X-Ray and Magnetic Particle testing of all welds. The assembly of these stations included over fifteen hundred 600# and 900# flanged bolt-ups. Fabrication and assembly was performed at the Monroe Pipe Fabrication facility and shipped to the owner storage yards for future installation.

PROJECT DETAILS:
  • Project Owner:
    Confidential Client
  • Location:
    Eastern Ohio
  • Delivery Method:
    Self-Performed
SERVICES:
  • Pipe Fabrication