Power & Renewable Energy ON-TIME DELIVERY OF CCGT FACILITIES

Kokosing Industrial provides the full range of self-performing construction services for combined-cycle gas-fired turbine (CCGT) clients.

INSIDE THE PROJECT

The Kokosing family of companies is your combined cycle contractor. We utilize our workforce to self-perform all work including site civil, concrete foundations, structural steel erection, HRSG erection, electrical, instrumentation and controls, equipment setting, start-up, and commissioning. In addition to self-performing construction of the facility, Kokosing’s Central Engineering Group contributes experience in Design-Build of onsite treatment plants, site utilities, and buildings; along with permitting, clash detection through BIM, and logistics expediting. The Kokosing team has contributed to a range of combined cycle facilities in challenging, schedule-driven environments including:

  • PSEG Waterford Energy Center, Waterford, Ohio
  • Fayette Energy Center, Masontown, Pennsylvania
  • Dominion Dresden Energy Center, Dresden, Ohio
  • PSEG Lawrenceburg Generating Station, Lawrenceburg, Indiana
  • Hanging Rock Energy Facility, Ironton, Ohio

WHY IT MATTERS

As a self-performing general contractor in the power industry for over 35 years, we provide turn-key construction services for grassroot facilities and capacity expansion projects in this region. The resurgence of gas power brings jobs and lower-cost power to our communities. The U.S. power industry is becoming increasingly reliant on CCGT plants for the majority of its capacity additions. Natural gas-fired plants are expected to have a significant increase of total provided energy capacity in the U.S.

PROJECT DETAILS
  • Project Owner
    Multiple
  • Location
    Ohio, Indiana, and Pennsylvania